- General building description
- Temporary swimming pool
- Daimlerstr. 32-36, Frankfurt/M
The planned contruction project at Daimlerstr. 32-36, 60314 Frankfurt,
involves building a temporary swimming pool, useable for approximatlely
five month.
The pool itself is made out of two welded together standard 40 feet containers
The support, ballustrade and stairs are constructed out of enemaled steelpoles
(see noted calculations).
The support structure is covered with wooden veneerplanks wich function as
a platform around the pool for sunbathing.
back to mainpage